Five nines live or die in the milliseconds between utility, UPS and generator. Inspector records those transitions — and the room conditions around them — with event-grade precision.
Typical monitored points in a deployment — final scope is engineered per site.
ATS and UPS transitions "work" — but nobody can show the waveform that proves it.
CRAC issues surface as slow temperature creep long before alarms fire.
When the feed dips, you need independent, time-stamped proof.
Small distributed rooms carry big loads with zero monitoring.
Transfer-scheme verification: measured, documented, repeatable.
Inspector records every source event and correlates it with room conditions.
Findings feed directly into UPS, ATS and cooling remediation.
Executive uptime reporting backed by engineering-grade data.
Verify your transfer scheme protects what it's supposed to.
Free digital assessment · Expert reviews for qualified facilities